Welcome To Native Power Technology Co., Ltd.

Native Power Technology Company Limited is playing major role in Myanmar’s Oil and Gas Field and it is leading by Myanmar Nationals who has abundant well -Experienced Electrical, Mechanical, and Geologist Expert from Ex. MOGE. NPT has been dedicated in supplying the highest quality oilfield products, downstream equipments & engineering service in Filtration, Metering,

Pressure Reducing and LPG Storage, Distribution Terminal, Cathodic Protection, Electrical Power System Installation, Commissioning Service and solution provider in Myanmar. Our engineers have received continuous professional courses in our field and well applied these requirements. Therefore, we have achieved strongly recommended and unparalleled track record from Myanma Oil and Gas Enterprise. We are willing to provide you the first rate service with our advanced technology and high-qualified staff. NPT sincerely invites friends from all over the world to cooperate with us and create a bright future together.

 

EVENT HISTORY

PROJECT INSTALLATION OF 6” 1.5 MILES NATURAL GAS PIPE LINE CONSTRUCTION AND 3 MMSCFD GAS FILTRATION, REDUCTION AND METERING GAS SKID INSTALLATION AT KANBAUK (PETRO & TRANS)

pro-installation-kb-01
pro-installation-kb-02
pro-installation-kb-03
 
pro-installation-kb-04
pro-installation-kb-05
pro-installation-kb-06
 
pro-installation-kb-07
pro-installation-kb-08
pro-installation-kb-09
 
pro-installation-kb-10
 
 

PROJECT INSTALLTION OF 10” 1 MILES NATURAL GAS PIPE LINE CONSTRUCTION AT THAKETA, YANGON (VPOWER)

pro-installation-tkt-11
pro-installation-tkt-12
pro-installation-tkt-13
 
pro-installation-tkt-14
pro-installation-tkt-15
pro-installation-tkt-16
 
pro-installation-tkt-17
pro-installation-tkt-18
pro-installation-tkt-19
 
pro-installation-tkt-20
pro-installation-tkt-21
pro-installation-tkt-22
 
 

PROJECT INSTALLATION OF 6” 866 METER TEMPORARY GAS PIPE LINE CONSTRUCTION AT KYAUK PHYU (VPOWER)

pro-installation-vp-10
pro-installation-vp-02
pro-installation-vp-03
 
pro-installation-vp-04
pro-installation-vp-05
pro-installation-vp-06
 
pro-installation-vp-07
pro-installation-vp-08
pro-installation-vp-09
 
pro-installation-vp-10
 
 

PROJECT INSTALLATION OF 40 MMSCFD FILTRATION, REDUCTION AND METERING SKID SUPPLY & INSTALLATION (MAXPOWER THAKETA)

pro-installation-tkt-01
pro-installation-tkt-02
pro-installation-tkt-03
 
pro-installation-tkt-04
pro-installation-tkt-05
pro-installation-tkt-06
 
pro-installation-tkt-07
pro-installation-tkt-08
pro-installation-tkt-09
 
pro-installation-tkt-10
 
 

CATHODIC PROTECTION SYSTEM INSTALLTION OF YENANCHAUNG-MAGWAY 20” (18 MILES) GAS PIPE LINE

cathodic-pro-ync-01
cathodic-pro-ync-02
cathodic-pro-ync-03
 
cathodic-pro-ync-04
cathodic-pro-ync-05
cathodic-pro-ync-06
 
cathodic-pro-ync-07
cathodic-pro-ync-08
cathodic-pro-ync-09
 
cathodic-pro-ync-10
 
 

PROJECT INSTALLATION FOR COOLING WATER PIPE LINE (SUPPLY & RETURN PIPE LINE)(KYAW SWAR FERTILIZER)

pro-installation-ks-01
pro-installation-ks-02
pro-installation-ks-03
 
pro-installation-ks-04
pro-installation-ks-05
pro-installation-ks-06
 
pro-installation-ks-07
pro-installation-ks-08
pro-installation-ks-09
 
pro-installation-ks-10
 
 
 

PROJECT INSTALLATION FOR 8” (1 MILES) NATURAL GAS PIPE LINE INSTALLATION, MAIN GAS SKID INSTALLATION OF GAS-FIRED COMBINED CYCLE POWER STATION (KYAUK PHYU)

pro-installation-kp-01
pro-installation-kp-02
pro-installation-kp-03
 
pro-installation-kp-04
pro-installation-kp-05
pro-installation-kp-06
 
pro-installation-kp-07
pro-installation-kp-08
pro-installation-kp-09
 
 

Cathodic Protection System Installation for Naungdon - Ywama 14 inches Gas Pipe Line (32) Miles.

cathodic-protection-system-01
cathodic-protection-system-01
cathodic-protection-system-01
 
cathodic-protection-system-04
cathodic-protection-system-05
cathodic-protection-system-06
 
cathodic-protection-system-07
cathodic-protection-system-08
cathodic-protection-system-09
 
cathodic-protection-system-10
cathodic-protection-system-11
 
 

Project Installation for 10" Natural Gas Piping System, 145 MW Gas Engine Power Plant at Bellin (Powergen Kyaukse) (2018-2019)

natural-gas-piping-system-01
natural-gas-piping-system-02
natural-gas-piping-system-03
 
natural-gas-piping-system-04
natural-gas-piping-system-05
natural-gas-piping-system-06
 
natural-gas-piping-system-07
natural-gas-piping-system-08
natural-gas-piping-system-09
 
natural-gas-piping-system-10
natural-gas-piping-system-11
natural-gas-piping-system-12
 

14" Pipe Sleeve buried for Road Crossing at Bellin (Powergen Kyaukse) (2018-2019)

pipe-sleeve-buried-01
pipe-sleeve-buried-02
 
pipe-sleeve-buried-03
pipe-sleeve-buried-04
 

Welding Processing for 4" HRC Line at Bellin (Powergen Kyaukse) (2018-2019)

welding-processing-01
welding-processing-02
welding-processing-03
 
welding-processing-04
welding-processing-05
welding-processing-06
 
welding-processing-07
welding-processing-08
welding-processing-09
 
welding-processing-10
welding-processing-11
welding-processing-12
 
welding-processing-13
welding-processing-14
welding-processing-15
 
welding-processing-16
 
 
 

FAT (Factory Acceptance Test) for Internal Gas Skid and GRMS Skid at TechSep Engineering (India)

factory-acceptance-test-01
factory-acceptance-test-02
 

Internal Gas Skid Mobilization

internal-gas-skid-mobilization-01
internal-gas-skid-mobilization-02
 

Installation Service for Internal Gas Skid at Bellin

installation-service-01
installation-service-02
 
installation-service-03
installation-service-04
 

Internal Gas Skid with 8 Gas Train System for Gas Engine at Bellin (Powergen Kyaukse Power Plant) (2018-2019)

internal-gas-skid-01
internal-gas-skid-02
 

Main Gas Skid Assemble and Installation at Bellin (Powergen Kyaukse Power Plant) (2018-2019)

internal-gas-skid-03
internal-gas-skid-04
 

On going Project of Process Pipe Line Construction at DENKO (Thilawa) (2019)

on-going-project-01
on-going-project-02
on-going-project-03
 
on-going-project-04
on-going-project-05
on-going-project-06
 
on-going-project-07
on-going-project-08
on-going-project-09
 
on-going-project-10
on-going-project-11
on-going-project-12
 
on-going-project-13
on-going-project-14
on-going-project-15
 

NPT Tool Box Talk Meeting at DENKO Site

npt-tool-box-talk-meeting-01
npt-tool-box-talk-meeting-02
npt-tool-box-talk-meeting-03
 

CATHODIC PROTECTION SYSTEM INSTALLATION FOR 30” DOMESTIC NATURAL GAS PIPE LINE

Location : Ywama-Hlawga-Tharketa in Yangon
Project : CATHODIC PROTECTION SYSTEM INSTALLATION
Project type : Tunkey {Engineering, Procurement, Commissioning (EPC)}
Purchaser

: Myanma Oil and Gas Enterprise
  complex 44, Nay Pyi Taw, Myanmar

Contract : 09-12-2013
Commissioning : 30-05-2015
Pipe size : 30 inches
Length : 35 Miles
Material : CATHODIC PROTECTION EQUIPMENT and Accessories
Progress

: Native Power Technology supplied all man power , materials and technology.
- Perform 100% Cathodic Protection System of 30” API 5L X65 (PE Coated)
Total Length 35 Miles Ywama- Hlawga-Tharketa Domestic Gas pipeline
- Establish detail procedure for the permanent impressed current cathodic
protection system designed for a 25 years design life and responsible for surveying, designing, purchasing, installation and commissioning of Cathodic
Protection system.
- Our company prepare the overall work schedule to meet the Company’s requirement and submit to the company before start working and provide a job one
week (minimum) training program for MOGE engineers how to install and maintain the system to the company.

 

engery-history-01

Cathodic Protection System
for MOGE 30 inch pipeline

engery-history-02

Cathodic Protection System
for MOGE 30 inch pipeline

engery-history-03Test Points route of Cathodic Protection for
30 inch -35 miles Gas Pipe line (Ywama-Hlawka-Thaketa)
engery-history-04

Cathodic Protection System
for MOGE 30 inch pipeline

engery-history-05Test point and Preparation
Exothermic weld point for cathodic Protection
engery-history-06

Test point and Preparation
Exothermic weld point for cathodic Protection

 

10 inch x 2 miles Pipe line installation for MEPE

Project :Kanbauk 200 MW Combined Cycle Power Plant
Project type Purchaser :Turnkey (Supply materials, Installation and Commissioning)
(a)10” x 2 miles Pipe line & installation.
(b)Non Destructive Testing (NDT)
(c)Cathodic Protection System 
(d)Gas Filtration Skid, Pressure Reducing Skid and Fiscal Metering
Location

: Kanbauk,Yephyu Township,Taninthayi Region, Myanmar

Purchaser : Andaman Power and Utility Co. Ltd.
Contract : 09-12-2014
Commissioning : 01-04-2015 (Pipeline ,NDT , Cathodic Protection)
Gas Volume : 50MMSCFD
Pipe size : 10 inches
Length : 2 Miles
Pressure :400PSI

 

engery-history-0910” x 2 miles Natural Gas Pipe line installation
Project for MEPE at kanbauk
engery-history-10
10” x 2 miles Pipe line Route
engery-history-1110” x 2 miles Pipe line installation
Project for MEPE
engery-history-12Pipe Transportation engery-history-13Pipe Transportation engery-history-14Laying pipeline
engery-history-15
Laying pipeline
engery-history-16
Pipe line Dozing
engery-history-17

10” x 2 miles Pipe line
crossing over Hein Ze creek

engery-history-18

10” x 2 miles Pipe line
crossing over Hein Ze creek

engery-history-19
Pipe line Dozing
engery-history-20
Pipe laying under vehicle road
engery-history-21Pipe laying on the concrete block engery-history-22Pipe line warning sign for safety engery-history-235G welding Job
engery-history-24
5G welding Job
engery-history-25

Heat shrinkable Sleeve
tape wrapping

engery-history-26

Testing of pipe
welding (NDT-UT test)

engery-history-27

Pressure Test (Hydrotest)
and dewatering

engery-history-28
Foam Pig launching
engery-history-29

Pressure Test (Hydrotest)
and dewatering

engery-history-30
Natural Gas pipe line flushing
engery-history-31

10” x 2 miles Pipe line
installation Project for MEPE

engery-history-32

Compensate communities
for crop and land

engery-history-33


Installation of spark gaps

for Cathodic Protection

engery-history-34

Laying Titanium Mixed Metal Oxide Anode and
connection wire of Exothermic weld points for
Cathodic Protection

engery-history-35


Exothermic weld point for

Cathodic Protection

engery-history-36

Laying TI-MMO Anode and installation of
Exothermic weld points for Cathodic Protection

engery-history-37
10” x 2 miles Pipe line back filling

 

For External Gas Pipe Line of 60T/D Newsprint Paper Mill Project (Thabaung)

Location : 60Tonage per day Newsprint Paper Mill, Tharbaung Township, Ayeyarwaddy Region
Project : External Gas Pipe Line of 60T/D Newsprint Paper Mill Project
Project type : Turnkey {Engineering, Procurement, Commissioning (EPC)}
Purchaser : PAPER & HOME UTILITY INDUSTRIES ,Ministry of Industry
Contract : 09-12-2013
Commissioning : 30-05-2015
Pipe size : 6 inches
Length : 2 Miles
Material : Pipe, Coalescing Gas Filter skid, Pressure Reduction Skid ,Metering System and Accessories
Progress : On 2014 – 2015: We Native Power Technology Co.,Ltd. as “ Contractor” had been contracted with PAPER & HOME UTILITY INDUSTRIES (PHUI), an enterprise organized and existing under the law of the Republic of the Union if Myanmar as “Purchaser” for Gas Regulating & Metering Station and 6” Pipe Line Installation Services. The “Purchaser” has being of Myanmar wishes to construct, maintain, own and operate Gas Coalescing Filter Skid, Metering System and Pressure Reduction Skid for External Gas Pipe Line for 60 T/D Newsprint Paper Mill Project (Tharbaung). 60T/D Newsprint Paper Mill Project (Tharbaung)
The “Contractor” shall obtain the “Purchaser” approval for any deviations from the requirements of the specification, and/or codes, standards and specifications referred to in this Contract. And following the scope of work to be performed by Contractor ; Coalescing Gas Filter Skid Pressure Reduction SkidF low Measurement System
- All Piping Network
- All skid cable laying and instrumentation
- Factory Acceptance Test (FAT), Site Acceptance Test (SAT)
- Pre – commissioning, Commissioning & Start – up.

 

engery-history-38

External Gas Pipe Line 60Ton per Day
Newsprint Paper Mill Project(Thabaung)

engery-history-39

6” Pipe Line 1300ft
Installation and NDT Test, Hydro Test

engery-history-406” Pipe Line 1300ft Installation
and NDT Test, Hydro Test
engery-history-41

6” Pipe Line 1300ft Installation
and NDT Test, Hydro Test

engery-history-42

6” Pipe Line 1300ft Installation
and NDT Test, Hydro Test

engery-history-43

6” Pipe Line 1300ft Installation
and NDT Test, Hydro Test

engery-history-44

6” Pipe Line 1300ft Installation
and NDT Test, Hydro Test

   

 

Mawlamyaing 230MW MEPE Gas Turbine Project

Location : Mawlamyaing Ngantae Gas Turbine
Purchaser : Myanmar lighting (IPP) Co., Ltd.
Contract : 09-12-2013
Commissioning : 24-03-2015
Gas Volume : 50MMSCFD
Pipe size : 14 inches
Length : 2 Miles
Pressure : 350PSI
Project type :Turnkey (Supply materials, Installation and Commissioning)

 

engery-history-45

Mawlamyaing 230MW
MEPE Gas Turbine

engery-history-46
Installation of Gas Filter Skid
engery-history-47

Installation of Gas Filter Skid
engery-history-48Mawlamyaing 230MW
MEPE Gas Turbine

 

FL Smidth Products and Services seminar

FL Smidth A/S & Native Power Technology Co., Ltd. Presented as the following title at Mandalay hill resort hotel on 19-05-2015

Mr. Mikkel Diness Vinedeloev
Country Head , FL Smidth Indonesia

Greeting message

Mr. Rune Hurttia
FL Smidth Cement Division

The FL Smidth Cement Plant- Reliability and Effiency Delivered

Mr. Jacob Joergensen
FL Smidth Customer Services

FL Smidth Customer Services

Mr. Leo Carnevale
FLSmidth Ventomatic

Innovative , Solutions for your Packing Plant

Mr. Ning Shen Tan
FLSmidth Pfister

Dosing System

Mr. Sujith Varghese George
FLSmidth Maag

Reliable Gear Technology comes from Progress

Mr. Rasmus Ellefsen
FLSmidth Airtech

Air Pollution Control for the cement industry

 

engery-history-49 engery-history-50
engery-history-51 engery-history-52
FL Smidth Products and Services seminar

 

Aviation Turbine Fuel 16" Ø Pipe Line Project

Location : International Airport in Yangon
Project : Aviation Turbine Fuel 16" Ø Pipe Line Project
Project type :Turnkey {Engineering, Procurement, Commissioning (EPC)}
Purchaser : Myanma Petroleum and Product Enterprise complex 44, Nay Pyi Taw, Myanmar
Contract : 08-12-2011
Commissioning : 30-09-2013
Pipe size : 16 inches
Length : 0.32Miles
Material : Pipe and CATHODIC PROTECTION EQUIPMENT with Accessories
Progress

:Material Collection (Foreign) Site Preparation Dismantling the associated materials in Hydrant Pits Cutting , Breaking and removing of con; slab(Apron)
Excavating in the hard soil Removing and Dumping the excavated materials Dismantling , removing , dumping and stacking of 6"ф old Pipe Lines Sand filling, Watering and ramming (Under Apron) Sand filling, compacting and resurfacing of the hard soil Grade 30 Cement conc; with RSA for Apron Installation of ATF Pipe line with all necessary fittings Fabrication and Erection of Hydrant Pits with all necessary fittings Pressure Test for ATF Pipe line Cleaning for inner surface of ATF Pipe line Anticorrosive (Bitumastic) painting works (Two costs) Densoclad taping Cathodic protection work for ATF pipe line Air Craft and Fuel Tanker Grounding Providing of flushing point Flushing and Commissioning Ultrasonic Test Other works (Sand Blasting)

 

engery-history-53

Aviation Turbine Fuel
16" Ø Pipe Line Project

engery-history-54

Aviation Turbine Fuel
16" Ø Pipe Line Project

engery-history-55
Site preparation (Trenching)
engery-history-56
Site preparation(Old Pipe line)
engery-history-57
Site preparation
engery-history-58

Site preparation
(Laying pipe under ground)

 

Maintenance and Service

engery-history-59 engery-history-60 engery-history-61
engery-history-62 engery-history-63 engery-history-64

Join Us

Our Visitors

sc_flag(1205718,"FFFFFF","000000","ffffff",2,10,0,0)

Contact Us

address-iconNo. 149/14, Phan Chat Wun U Shwe Oue Street, Section (1), Ward (113), East Dagon, Industrial Zone, Yangon, Myanmar.

phone-icon95-1-704246

fax-icon+95-1-8566187

email-iconnativepowercontact@gmail.com, infonative.mm@gmail.com

web-iconnativepowertechnology.com